Local Reefers 180 Gallon Hard Line Plumbing Upgrade With Red/Blue PVC.
Layout
- 4 Way Manifold With GFO/Carbon Reactor & UV Connected
- Blue 1" Drains
- Red 3/4" Returns With Ball Valves To Dial In Flow And Add Back Pressure To The Manifold
- Total Labor Time Approx 4 Hours